Case study

LIPA project: powering the US grid

  • LIEU
    USA
  • PARTENAIRE
    American Superconductor (AMSC)
  • MARCHÉ
    Supraconductivité

Overcoming grid constraints while minimising the cost and environmental impact of upgrades

Utilities need ways to overcome grid constraints, while minimising the cost and environmental impact of upgrades. The LIPA project in the US state of New York demonstrated how superconducting cables can address these needs in a high-voltage transmission grid. The project was coordinated by American Superconductor and funded by the US Department of Energy.

138 kVAC

Voltage

2 400 A

Current

600 MVA

Power

2008-12

Connected to grid

Nexans superconducting cable systems: a world's first in transmission cable system

Nexans developed and delivered a complete 138 kV AC superconducting cable system, including the cable core, the cryogenic envelope and the terminations. Nexans was also in charge of supervising cable pulling in ducts and of installing terminations. The host utility was the Long Island Power Authority.

The project established the feasibility of using HTS cables in a transmission grid, with benefits that included the ability to carry more power in an existing right of way. The LIPA project established several world records for superconducting cables when it was installed, including longest cable, first in-grid transmission cable system at transmission voltage, and highest power.

Contactez-nous

Sujets sur lesquels vous souhaitez obtenir plus d'informations :

* Champs obligatoires

Veuillez vérifier votre saisie et réessayer.

Une adresse mail ne peut contenir qu'un seul @

Protection des données personnelles

Vous avez le droit de vous opposer au traitement de vos données personnelles et/ou à leur utilisation à des fins de marketing direct ou à des fins commerciales.

Merci !

Merci de nous avoir contactés. Nous vous contacterons sous peu.

Erreur

Une erreur s'est produite. Veuillez réessayer.

Fermer