What can you do in practice?

AMPACITY : EV Charging Infrastructure project

Initial equipment of the underground car park of the Nexans Ampacity site with 6 first 40 Meter charging stations 4x1x50 mm² NEXANS Cca - FR-N1X1G1-AR IRVE pulled into the existing core hole.

The project was implemented using Nexans cables, Michaud connectors and Unex cable trays.

TIME SAVINGS

"The installation is quicker than a NF C15-100 star installation, and there are far fewer cable runs. It's easy to fit into existing boreholes".

 

EVOLUTIVITY

"All you have to do is install the new connections and protection to the new charging points."

 

EASIER OPERATION

 

"If there's maintenance to be carried out, there's no need to shut down the whole installation (...) no need to look everywhere for the main board key".

- Installer Project Manager

Contact us

Topics on which you wish to get more informations:

Required fields*

Please check your entry and try again.

An email address must contain a single @

Personal data protector

You have the right to object to the processing of your personal data and/or their use for direct marketing or commercial purposes

Thank you!

Thanks for contacting us. We will be in touch with you shortly.

Error

An error occurred. Please try again.

Close